VES Electrical successfully completed a project involving 43 tunnel ventilated broiler sheds, delivering comprehensive services throughout the entire lifecycle.

HHG Yannathan

Tunnel Ventilated Broiler Sheds

Project Summary

Our team managed the design, supply, delivery, installation, and commissioning of the sheds, ensuring optimal performance and efficiency. Additionally, we provide 24/7 service support, guaranteeing continuous operation and peace of mind for our clients.

This project highlights our expertise in delivering complex, large-scale solutions with a commitment to quality and reliability.

Project: 43 Tunnel Ventilated Broiler Sheds
Location: Heath Hill, Catani, Yannathan Victoria
Duration: 2014-2022
Scope: Design, Supply, Deliver, Install, Commission, 24/7 Service (Complete Lifecycle)

Design, Installation and Onsite Wiring

  • 10 Backup Generators (Duty / Standby)
  • 5 Main Switchboards with ATS controls
  • 19 Main Ventilation Control Cabinets (Fancom)
  • 19 Equipment Winch Control Panels
  • 5 Water Treatment Plants
  • 5 Workshop and Amenities Buildings
  • 5 Medium Temp Cool Rooms
  • 27 Complete Poultry Shed Wiring
  • 16 Poultry shed Controls Upgrades
  • Underground Electrical Services

Features

  • Fancom F38 Climate Controller
  • ABB Switchgear
  • VES Proprietary LED Mimic Display
  • VES Low Heat Dissipation Controls
  • VES Proprietary Alarm Annunciator
  • POLA HP13 Backup Alarm
  • Backup Power Supplies